Green Line Metro Upgrade Study (Study 3) 2018

Green Line Metro Upgrade Study (Study 3) 2018

The Green Line Metro Upgrade study was carried out to determine the extent of the infrastructure works required to upgrade the current Luas Green Line to a fully segregated Metro standard between Charlemont and Sandyford. The study details some of the infrastructure modifications required to facilitate the continuation of the MetroLink services beyond Charlemont to Sandyford.

To achieve metro service levels a number of modifications and enhancements are proposed including changes to existing road junctions, vehicular and pedestrian access across the Luas Line and Luas stops. Modification at stations will include such things as the installation of a pedestrian over-bridge at each Luas Stop.

Green Line Metro Upgrade - Line B

Green Line Metro Upgrade – Line B - Appendix 2 

Green Line Metro Upgrade – Line B - Appendix 3