M400 / M500 Packages


M400 Design and Build Civils Works Packages 

The two M400 (M401 and M402) contracts will provide design and delivery of metro tunnels, stations and structures, track, shafts, river and road crossings, surface and other civil works. The scope of each of the M400 Main Civils Infrastructure Contracts comprises:  

Southern Section M401 – Charlemont to Northwood:  

  • Bored tunnels and portals, evacuation / intervention shafts.  
  • Below ground station excavations at Charlemont, St Stephen’s Green, Tara, O’Connell, Mater, Glasnevin, Griffith Park, Collins Avenue, Ballymun, Northwood up to 35 m deep (shell and core structures).  

Northern Section M402 - Northwood to Estuary:  

  • M50 viaduct, surface route (retained cut, cut and cover) and at-grade sections.  
  • Estuary Station Park and Ride Facility (bulk earthworks and site preparation).  
  • Preparation of the Dardistown Depot site and access road.  
  • Bored tunnels and portals, evacuation / intervention shafts.  
  • Stations and associated logistics including Dardistown, Dublin Airport, Fosterstown, Swords Central, Seatown and Estuary. 

Click here for interactive route map. 

FAQs 

MetroLink M400 FAQs January 2026 

Link to M400 Contract Notices 

February 2026 

M500 Service Delivery Partner Packages DBFOM  

The design, supply, construction, operation, maintenance and financing of the metro rolling stock, signalling system (at Grade of Operation 4 - an automated railway (“GoA4”)), a railway depot and maintenance facility, park and ride facility, metro control centre building(s) together with the installation of all line-wide trackwork, overhead contact system, power and communication systems, mechanical and electrical systems including tunnel and station ventilation, people movement systems, construction of internal walls and secondary civil and building works within the shell-and-core structures of the underground stations (built by others), the fit out of finishes in sixteen stations (above and below ground) and design and construction of urban realm features including all ancillary works. 

Operation and maintenance of all assets comprising MetroLink including shell-and-core structures and tunnel segments. 

FAQs 

Link to M500 Contract Notices 

May 2026 

M400 and M500 Procurement Timelines  

MetroLink recognises the importance of providing clear and reliable information on the M400 and 500 procurement process.  For contracts that are in procurement we will release updates directly to participating contractors/ suppliers via the MetroLink eSourcing Portal. 

Below is a summary of the status of M400/500 contracts released to date. 

Contract package 

Contract Notice 

Status 

M401 

PQQ 

Closed 

M402 

PQQ 

Closed 

M500 

PQQ 

Closed 

Programme-wide FAQs  

We have prepared responses to Frequently Asked Questions. These will be updated periodically as the programme evolves.